JCIDS Methodology - Use top level strategic guidance as a basis for identifying and describing shortfalls in joint warfighting capability, determine functional capability needs and alternatives for meeting those needs, and provide the basis for establishing priorities by identifying Warfighter deficiencies or needs

Doctrine, Organization, Training, Materiel, Leadership, Personnel, Facilities, and Policy (DOTMLPF-P) - JCIDS document that is refferred to for the requirements generation process.

PPBE Methodology - Calendar-driven process used for securing funding for a major acquisition program, offers the basis for informed affordability assessment and resource allocation decisions, and provides a formal, systematic structure for making decisions on policy, strategy, and the development of forces and capabilities to accomplish anticipated missions.

Planning - During this stage in PPBE, a national defense strategy is defined and a plan is developed for executing the strategy.

Programming - During this stage in PPBE, proposed programs are fleshed out and a Program Objective Memorandum (POM) is written.

Budgeting - During this stage in PPBE, which occurs concurrently with the programming phase, proposed budgets and programs are reviewed and the Budget Estimate Submission (BES) is prepared

Execution - During this stage in PPBE, programs are evaluated and measured against established performance metrics, including rates of funding obligations and expenditures.

Transitioning to Integrated Product and Process Development (IPPD) will involve application of certain key tenets, such as customer focus, concurrent development, and: - Event-driven scheduling.

Which one of the following T&E products is required at Milestone C? - Approved TEMP

If a contractor chooses to use their own quality system, they must demonstrate compliance with the established military standard through formal third party certification. . - False.

A _______ is an aggregation of program elements that reflects a macro-level force mission or support mission of DOD. - Major Program (MP).

Which of the following is recognized as a barrier to the successful implementation of Integrated Product and Process Development (IPPD)? - Lack of commitment from top management

In fixed-price contracts: - The government can terminate the contract for default if the contractor is late or his product does not meet specifications.

Which one of the following is a duty of the Director, Operational Test, and Evaluation (DOT&E)? - Reviewing and analyzing the results of operational test and evaluation (OT&E) conducted for each major DoD acquisition program.

The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? - 1. Systems Threat Assessment (STA)

2. Initial Capabilities Document (ICD)

3. Acquisition Program Baseline (APB).

Critical Intelligence Parameters (CIPs) are those key performance thresholds of foreign threat systems, which, if exceeded, could compromise the mission effectiveness of the U.S. system in
development. Adversary military doctrine, tactics, strategy, and ______________ of systems should be considered in CIPs. - Expected employment.

The first key step of the Product Support Strategy Process Model includes which of the following? - Understanding Warfighter requirements in terms of performance.

If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E) products is required before the Full Rate Production Decision Review? - DOT&E report on initial operational test and evaluation.

Each of the following issues impact test planning and execution activities except one. Select the one that is NOT a test planning/execution issue. - Limited test reports

The National Environment Policy Act (NEPA) can affect defense acquisition program managers because: - NEPA requires environmental impacts to be considered in the decision making process for acquisition programs.

In which phase of the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on development of sustainment metrics to influence design, the product support strategy, and on actions that can be taken prior to the next milestone to reduce future operating and support costs? - TMRR Phase.

In which phase of the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on developing the execution plan for the design, acquisition, fielding, and competition of sustainment activities to deliver the Product Support Package? - EMD Phase

The four common risk mitigation strategies are: - Avoiding, Mitigating, Transferring, and Accepting

What do operational testers evaluate to determine the degree to which a system is usable in its intended environment, e.g., reliable, supportable, maintainable, and transportable? - Measures of Suitability (MOS).

The Joint Staff has oversight for certifying interoperability capability requirements for the Army, Navy, Air Force, and Marine Corps are valid. - True.

Preview document (3 van de 15 pagina's)

Unlock document

Download alle 15 pagina's voor € 35,99

Document in winkelwagen
Document rapporteren Document rapporteren

Voordelen van Knoowy

€ 35,99

Document in winkelwagen
  • check Niet tevreden? Geld terug
  • check Document direct te downloaden
  • check € 0,50 korting bij betalen met saldo
  • check Ontvang gratis oefenvragen bij document

Specificaties

Verkoper

ENOCK81

13 documenten geüpload

Verdienen aan je samenvattingen?

icon 2

Maak je zelf samenvattingen of heb je nog uitgewerkte opdrachten liggen? Upload je documenten dan op Knoowy en verdien geld.

Document uploaden

Al meer dan 146.000 tevreden studenten

  • Erik  Wemmers
    Erik Wemmers

    Online kun je studenten helpen met notities en samenvattingen terwijl je niet meer echt naar je samenvatting hoeft om te kijken. Het past goed bij je studie en je kunt tegelijk wat bijverdienen!

  • RTNederland
    RTNederland

    Nadat ik Knoowy ontdekt heb, ga ik regelmatig op zoek naar eventuele bruikbare samenvattingen! Heel erg handig!

  • Nicole02
    Nicole02

    Goed voor als je een samenvatting nodig hebt of de leerstof niet zo goed snapt, maar ook voor als je bijles nodig hebt.

  • tarikkkk
    tarikkkk

    Knoowy is heel handig om te gebruiken en je vind snel het materiaal dat je nodig hebt.

  • sandervdellen
    sandervdellen

    Knoowy is een zeer goed platform voor samenvattingen en ik zou het aanraden.

  • dollyvanderpoel
    dollyvanderpoel

    Ik ben altijd erg blij met de samenvattingen van Knoowy.

  • JadeVanBignoot
    JadeVanBignoot

    Knoowy is zeker aan te raden. Het is goedkoper dan andere platforms.

  • Pinjeu
    Pinjeu

    Prima service, snelle afhandeling. Ik ga hiervan gebruik maken gedurende mijn hele studie.

Inloggen via e-mail
Nieuw wachtwoord aanvragen
Registreren via e-mail
Winkelwagen
  • loader

Actie: ontvang 10% korting bij aankoop van 3 of meer items! Actie: ontvang 10% korting bij aankoop van 3 of meer items!

Actie: ontvang 10% korting bij aankoop van 3 of meer items!

loader

Ontvang gratis €2,50 bij je eerste upload

Help andere studenten door je eigen samenvattingen te uploaden op Knoowy. Upload ten minste één document en krijg gratis € 2,50 tegoed.

Upload je eerst document