Which source provides information about the facility and its
components as they exist prior to a new project? - ANSWERArchived project data
What should project managers do at the start of a project to
increase the chance of success? - ANSWER-assure there is a
shared understanding of the end purpose of a project.
Which is true of the steps involved in defining project success? -
ANSWER-Specifying nonessential parameters is as important as
specifying essential ones.
When defining project success, after the business need is
defined, what could be used in the next step of the process? -
ANSWER-Statement of requirements
Which documents includes details such as adjacency diagrams,
space standards, and information on current and future staffing
count for business units? - ANSWER-Statement of requirements
The tradeoffs made in the project triangle are part of which
SMART (specific, measurable, achievable, relevant, time-bound)
element? - ANSWER-Relevant
2 | P a g e
Which statement is true of programming? - ANSWER-It makes
projections similar to forecasting but is more focused than
forecasting.
Which is an attribute of a project? - ANSWER-Projects are finite.
Which work activities should be treated as a project? - ANSWERRelocating whole departments within the same building.
Which is true of facility management (FM) organization projects? -
ANSWER-Projects can be initiated to address the results of
programming.
Which is an example of the application of sound management
techniques by a project manager? - ANSWER-they break down a
task further if it remains at the same percent completion despite
reported progress.
What does a project manager need to be successful? - ANSWERAbility to hire, discipline, and terminate project team members
Which is an advantage to using a standardized project
management model? - ANSWER-The model is a framework that
project managers can adapt to project specifics.
In the project model, what do outputs from the Plan phase
become? - ANSWER-inputs to the Do phase.
Which PMBOK Process Groups involves establishing the scope
of the project and defining the course of action? - ANSWERPlanning
An FM organization's policy specifies use of a predefined project
management process. What is a typical feature of such a
process? - ANSWER-It lists specific persons from whom to seek
approvals.
3 | P a g e
A project has a long payback period. To what should the project
be linked to increase the chances the project will be approved? -
ANSWER-Strategic facility plans
What should a facility management contractor get from its
customer to initiate a project? - ANSWER-Scope/statement of
work
Which is set by policy at the start of a project? - ANSWEREstimating
What constraint addresses sensitivity to organizational politics
and influences how projects are identified and prioritized? -
ANSWER-Organizational culture

Preview document (3 van de 18 pagina's)

Unlock document

Download alle 18 pagina's voor € 32,99

Document in winkelwagen
Document rapporteren Document rapporteren

Voordelen van Knoowy

€ 32,99

Document in winkelwagen
  • check Niet tevreden? Geld terug
  • check Document direct te downloaden
  • check € 0,50 korting bij betalen met saldo
  • check Ontvang gratis oefenvragen bij document

Specificaties

Verkoper

PROFICIENT TUTOR

141 documenten geüpload



PREMIUM TUTORING AND HOMEWORK ASSISTANCE GUARANTEED (A+) GRADE RESULTS FOR QUIZZES AND EXAMS.
As an expert tutor on KNOOWY, I specialize in psychology, nursing and human resource management. My top priority is assisting students with high-quality, scholarly work that meets academic standards. I guarantee good grades by providing meticulously crafted and well-researched documents. Whether you need help with homework, tutoring, quizzes, or exams, you can rely on my expertise and dedication to achieve outstanding results.

Verdienen aan je samenvattingen?

icon 2

Maak je zelf samenvattingen of heb je nog uitgewerkte opdrachten liggen? Upload je documenten dan op Knoowy en verdien geld.

Document uploaden

Al meer dan 146.000 tevreden studenten

  • Petra    van Berghe
    Petra van Berghe

    Ik vind Knoowy erg handig om samenvattingen van mijn opleiding te kopen.

  • FabriceVer
    FabriceVer

    Je spaart enorm veel tijd uit door gebruik te maken van deze samenvattingen!

  • RTNederland
    RTNederland

    Nadat ik Knoowy ontdekt heb, ga ik regelmatig op zoek naar eventuele bruikbare samenvattingen! Heel erg handig!

  • febeh
    febeh

    Betrouwbare website. Ik zet er zelf ook samenvattingen op en ik koop er ook.

  • tarikkkk
    tarikkkk

    Knoowy is heel handig om te gebruiken en je vind snel het materiaal dat je nodig hebt.

  • latijn
    latijn

    Kijk voor samenvattingen ook eens op Knoowy. Goede samenvattingen en betaalbaar.

  • kamalm
    kamalm

    Uitgebreid aanbod en zeer gebruiksvriendelijk! Al meerdere malen gebruik gemaakt en zoals steeds tevreden.

  • Simone Dijkstra
    Simone Dijkstra

    Juiste plek voor een goeie voorbereiding op je komende toets.

Inloggen via e-mail
Nieuw wachtwoord aanvragen
Registreren via e-mail
Winkelwagen
  • loader

Actie: ontvang 10% korting bij aankoop van 3 of meer items! Actie: ontvang 10% korting bij aankoop van 3 of meer items!

Actie: ontvang 10% korting bij aankoop van 3 of meer items!

loader

Ontvang gratis €2,50 bij je eerste upload

Help andere studenten door je eigen samenvattingen te uploaden op Knoowy. Upload ten minste één document en krijg gratis € 2,50 tegoed.

Upload je eerst document