Private work is not bid as tightly as public work because all bidders usually understand that a fair markup of a contractor's work is expected and that
- Numerous, unexpected change orders would become a nuisance
- The owner, architect, and contractor are likely to collaborate on a private project
- The quality of work on private projects is expected to meet only the specific standards
- When the contractor begins to seek extras, owners and architects believe they are being mistreated - CORRECT ANSWER-Numerous, unexpected change orders would become a nuisance
Due to the scope of the project, Cortland Company and May Contracting agreed to a cost-plus construction contract. Which one of the following accurately describes a cost-plus construction contract?
- A cost-plus contract includes cost of work and a fee for overhead and profit.
- A cost-plus contract is a fixed-price contract with a changes clause.
- A cost-plus contract includes costs of materials plus labor costs.
- A cost-plus contract includes work costs agreed to in advance plus cost overruns. - CORRECT ANSWER-A cost-plus contract includes cost of work and a fee for overhead and profit.
Which one of the following correctly describes the right of an owner or a contractor to terminate a contract?
- An owner or a contractor can terminate a contract at any time for any reasonable cause.
- Without a termination clause, an owner or a contractor can terminate a contract only for a material breach of contract.
- Without a termination clause, an owner can terminate a contract, but a contractor cannot.
- Without a termination clause, an owner or a contractor cannot terminate a contract for any reason. - CORRECT ANSWER-Without a termination clause, an owner or a contractor can terminate a contract only for a material breach of contract.
Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing?
· Heavy and highway construction
· General Engineering contractor
· General Building contractor
· Design/build contractor - CORRECT ANSWER-Heavy and highway construction
The project owner for a new shopping plaza being built in Highville is the Highville Municipal Property Company. The role of the project owner at the beginning of any construction project is to
· Engage consultants in fields in which it lacks the expertise necessary for the project
· Define a need for a facility and engage an architect or an engineer
· Furnish an estimated project cost that may be used to negotiate financing for the project
· Design the facility and prepare the plans and specifications for its construction - CORRECT ANSWER-Define a need for a facility and engage an architect or an engineer

Preview document (3 van de 46 pagina's)

Unlock document

Download alle 46 pagina's voor € 24,94

Document in winkelwagen
Document rapporteren Document rapporteren

Voordelen van Knoowy

€ 24,94

Document in winkelwagen
  • check Niet tevreden? Geld terug
  • check Document direct te downloaden
  • check € 0,50 korting bij betalen met saldo
  • check Ontvang gratis oefenvragen bij document

Specificaties

Verkoper

Winnie01

37 documenten geüpload

3 documenten verkocht


EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A+
Am an expert on major courses especially; psychology, Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why i'm one of the BEST GOLD RATED TUTORS in Knoowy. I assure a GOOD GRADE if you will use my work. / I am about quality. The documents herein guarantees an A+ for exams, essays, class discussions, term papers, quizlets and Q & A assignments. Do not hesistate to make your purchase. Investing in education is a life investment.

Verdienen aan je samenvattingen?

icon 2

Maak je zelf samenvattingen of heb je nog uitgewerkte opdrachten liggen? Upload je documenten dan op Knoowy en verdien geld.

Document uploaden

Al meer dan 146.000 tevreden studenten

  • PR
    PR

    Fijne website voor elke student die hulp nodig heeft bij het leren.

  • omerkx
    omerkx

    Samenvattingen zijn eenvoudig te bestellen en te downloaden via de website. Aan te raden.

  • MathieuHaldermans
    MathieuHaldermans

    Bespaart héél veel opzoekwerk en stress ook zeer overzichtelijk en gebruiksvriendelijk.

  • LeslieSeys
    LeslieSeys

    Gebruiksvriendelijke, overzichtelijke site. Makkelijk te raadplegen en goede zoekfunctie.

  • nijhuis
    nijhuis

    Bij Knoowy vind ik notities van vakken die mij helpen bij het leren.

  • Nicole02
    Nicole02

    Goed voor als je een samenvatting nodig hebt of de leerstof niet zo goed snapt, maar ook voor als je bijles nodig hebt.

  • sterrevanlommel
    sterrevanlommel

    Knoowy is heel handig om te gebruiken. Zeker aan te raden.

  • Elsie
    Elsie

    Ik verkoop samenvattingen om andere studenten te helpen en tegelijk wat bij te verdienen.

Inloggen via e-mail
Nieuw wachtwoord aanvragen
Registreren via e-mail
Winkelwagen
  • loader

Actie: ontvang 10% korting bij aankoop van 3 of meer items! Actie: ontvang 10% korting bij aankoop van 3 of meer items!

Actie: ontvang 10% korting bij aankoop van 3 of meer items!

loader

Ontvang gratis €2,50 bij je eerste upload

Help andere studenten door je eigen samenvattingen te uploaden op Knoowy. Upload ten minste één document en krijg gratis € 2,50 tegoed.

Upload je eerst document